AEROSPACE

Accelerate system maturity and reduce risk before first flight

Achieving earlier aircraft maturity and higher space system reliability are high on the agenda of every aircraft and space manufacturer and supplier. Like other industries, the aerospace sector faces a variety of new engineering challenges. How to significantly reduce time to market? How to successfully address the growing complexity of aircraft design and assembly? And how to guarantee that stringent aviation and space compliancy requirements are properly met?

The growing complexity of aircraft design leads to interdependent systems that not only necessitate far-reaching integration and continuous follow-up but also create new and more complex testing challenges.

Space system design involves meeting rigorous environmental constraints and stringent weight requirements. The payload must be able to withstand the pre-launch, the launch and flight path loading while delivering full functionality and avoiding damage to other critical components.

    • 350kN Vibration Test for 5 ton Space Satellite Payload

    • World Largest 700kN (Dual 350KN) Vibration Test for Space Vehicle Testing

    • Vibration Fatigue for Landing Gear Shock Absorber